Capler wrote:Cedar Fair tends to place record breaking attractions at Cedar Point. Since they have anointed Carowinds as being the Cedar Point of the south, their coaster installations here have been record breaking. Not regional, not US, but international record breakers. So I'm really interest to see what they have in mind for us next.
I'm also wondering if the reason construction started so early is because part of the coaster will extend beyond the walled area into the park where it will interact with other things already in place? Perhaps this phase will be done much later after daily operations end. One thing for sure, that leaked layout don't fit within the fenced area.
There are a few spots outside of the wall where some markings all, there is on in the waterpartk near the surfer swellll Not sure if it would be a support for the ride or if its for something else.... I think construction started so soo because of the amount of work they had to do to backfill etc from white waterfalls. I also think its going to be more than just the coaster with the expansion of the old county fair area with a path that will extend from ouside the waterpark back over to beside dodgem somewhere, where it will go out and back over to I dont know, just a thought, could be mega wrong, but the old bath house is still standing, so if it doesn't get demo'd I would think it would be remodeled to a bathroom. Not sure if all this would happen or not though, no real signs of anything like this, other than a ton of pavers under fury, which may not even be enough to make a whole new area and just be for an entry plaza etc.... I hope they do connect the paths from near the water park back over beside dodgem though, I think that would be a nice addition, maybe we will get lucky and get a flat or 2, besides flying eagles, I doubt all this would happen next year though...