General Carowinds discussion
#35001
nate g wrote:
Diamondback FOF wrote:
pb3176 wrote:Do they put the support and track together on the ground then lift both into place? It would seem easier.


(with correct grammar and spelling)

No. That would make the piece too heavy. Also, when they get to thye next support, it will be put up in pieces, not all at once. There would be too much weight in the middle so it would start to bow. They don't put the track on it while is is on the ground also because it would be really off balance.



Just thought I'd let you know your spelling is a little off too. :wink:


What?! My post looks like it has great spelling. I think you're just trying to make me look bad :lol:

Thanks, I fixed it.

pb3176 wrote:thanks for correcting my spelling but if you do that to all my messages you are going to want me to start paying you.


I was just bored and that one had really bad grammar. I'm not going to correct every one of your posts.
#35004
would be nice to have multiple cams to switch between to see different areas of the construction site.
not a rotating cam but letting you watch like 6 cams at once or selecting any of the 6 for a larger view.
#35007
Oh, I couldn't tell what that was, now I see, that thing is huge, I guess thats whats going to put us at 232ft. Time for the lift hill!!! :D

There is a peice of track sitting in the parking lot near the site, I'm guessing they are going to put it up tommorrow.
#35008
pb3176 wrote:thanks for correcting my spelling but if you do that to all my messages you are going to want me to start paying you.


If you used correct spelling, grammar, etc. to start with, nobody would be correcting your posts. It makes posts so much easier to read.
#35012
I feel like a noob saying this but I will anyways. There are two large cranes that will be assembled. You can see the bottom of the one that hasn't been assembled yet between the small white crane and the large crane that's already assembled in Wormy's photo. Arrows point to both of them. The one on the left is the assembled one:

Image
#35014
^No its not two cranes.

Diamondback didn't need two large cranes to assemble it.

That actually how some of those cranes are assembled.

The crane that was raised at KD today is a similar type but the crew put it together differently because they have the room to do so.

The space they re using to build the crane cals for it to be built like that,

The crane will be vertical by week's end!

Lift hill will be done in three weeks time. Hopefully.
#35017
What do you mean that's how they're assembled KDcoasterman? They don't use a huge crane to build another huge crane the same size. They use a small crane to build a larger crane. That's why you see the white small crane in Wormy's photo. Kings Dominion is using two cranes. Carowinds will also by the looks of it. The left arrow points to one crane that hasn't been assembled yet with a steel boom while the right arrow points to one that has. Neither of them are small cranes that have been used so far:

Image

If i'm wrong then i'll eat my shirt. Credit to Wormy for pic.
Last edited by carowindsman6654 on September 22nd, 2009, 10:50 pm, edited 3 times in total.
  • 1
  • 84
  • 85
  • 86
  • 87
  • 88
  • 232