General Carowinds discussion
By kirkgun
#67249
The crane operators appear to not be working today. So, no "new" track work.

However, there is some track work getting done. The cherry pickers are working. The orange one is back at the downhill side of the barrel turn. And the green one is at the section above entrance walkway (next to the bomb crater, where we see the nice green on the bottom of the track). They are probably re-torquing down bolts.

Plenty of work leveling the ground that will be the new part of the parking lot. Some digging out there too with the excavator, close to red crane that is on the dirt. Probably more drainage work.

Bathroom building seems like to little to no work being done. But there might be some work being done inside, that I can't see. But not much movement there.

But on the other side, the ticketing/guest services buildings are very busily getting worked on.

And oh yeah, I noticed that they are lowering materials down into the service road area, most likely working on that bridge.
User avatar
By Prongfan
#67250
Right.
I didn't mean to imply they weren't actually working on the track, I just didn't phrase it correctly.
They definitely are getting work done, even if they're not installing new track.
User avatar
By FamousAmos
#67253
[offtopic]Hey, was there am entrance into the restrooms from the Paladium side? Someone please describe it to me if you can, before I finalize my sketches.[/offtopic]

Also, those yellow sheets are probably insulation in the floor. I've seen that done before at a house (I watched it's construction from day one, to completion last month.) It's amazing how fast a structure can go up.
User avatar
By Axel
#67281
Some interesting spots in the video to me... any others for you?

0:35 a better overhead of the tunnel progress
0:40 seems like only about 9 pcs of track left in the parking area... (lots of supports). hope we get more soon.
0:43 great view of the track twists in the barrel turn
1:05 I'd dare to stand up there! (I'd even do it untethered). The yellow people basket has a full load. Christmas tree is gone.
1:11 cross supports are still there
1:13 time to look down that 320' 81 degree drop!!!
1:21 end
User avatar
By Jarsh
#67282
So around the 0:18 second mark you can see the progress on the entrance bridge. Can someone with a set of those blue prints explain what I'm seeing here? It looks like they've made two concrete walls on either side of the maintenance road that will act as supports for the bridge above.

I'm assuming they've got it dug out for the moment and that they will backfill around the wall later. Until then, it sure looks like a huge concrete building at the end of the plaza, lol. At any rate, at least we can tell that the bridge will indeed be twice it's original size. I wonder how long those two buildings on either corner (across the bridge) have left? They certainly impede the flow of the now wider bridge...

bridge.PNG
bridge.PNG (339.58 KiB) Viewed 2941 times
  • 1
  • 161
  • 162
  • 163
  • 164
  • 165
  • 504