Jarsh wrote:I don't know for certain, but you're on the right track. The do install it a link at a time, but they use a crane to pull the chain up the lift. Now, what they do when they have to run the chain back through the lift, I couldn't tell ya.


Here is the official word directly from Mike: "First they thread a cable through the chain channel, around the top and back through the chain return. The chain comes in smaller sections, I'm not sure how long, maybe 6' or 8'. They use master links to piece the sections together. The chain is REALLY heavy. They attach the cable to the chain and pull the chain through the channel using a crane. It took 2 days to install. The chain is now complete. The Travel Channel captured some footage, so I think it will be in the episode."

And there you have it!
#69663
Jarsh wrote:
Jarsh wrote:I don't know for certain, but you're on the right track. The do install it a link at a time, but they use a crane to pull the chain up the lift. Now, what they do when they have to run the chain back through the lift, I couldn't tell ya.


Here is the official word directly from Mike: "First they thread a cable through the chain channel, around the top and back through the chain return. The chain comes in smaller sections, I'm not sure how long, maybe 6' or 8'. They use master links to piece the sections together. The chain is REALLY heavy. They attach the cable to the chain and pull the chain through the channel using a crane. It took 2 days to install. The chain is now complete. The Travel Channel captured some footage, so I think it will be in the episode."

And there you have it!

Well now that we have confirmation that the chain is complete and that the trains will be installed within the next few weeks, I think it is safe to say that we will have testing by mid-late February or early March.
User avatar
By coasterbruh
#69665
Axel wrote:this pic from Mike's Twitter gives me a neck ache :)

Image

Now you know how we feel about...nevermind. I heard the track was completed??? Is it true, sorry I've been out enjoying life. Some of you guys should try it! :idea: :thumbup:
User avatar
By Axel
#69667
Yes, some of us will miss the amazing pics, stats, engineering and progress of this huge undertaking. Those that won't surely didn't need to post on this thread... they need to drum up more pictures for the "put a face to the name" thread :lol:
User avatar
By MarkD
#69668
Axel wrote:Yes, some of us will miss the amazing pics, stats, engineering and progress of this huge undertaking. Those that won't surely didn't need to post on this thread... they need to drum up more pictures for the "put a face to the name" thread :lol:


DOn’t yoU Continue to HavE a life? :crazy:

Does anyone know the angle at the top of the turn around just before you dive under the bridge?
User avatar
By MarkD
#69671
91 degrees! That is going to be one heck of a turn around. I took several pictures of that at the WWU but still can't grasp the many angles from the bottom of the turn around to the "under the bridge" section. There are many a twist in play.

Besides the awesome drop, is the one element I am looking forward to. I am thinking a long and sustained floater air section.