Coasterphreak wrote:I think that Premier shuttle idea is neat, but capacity's probably not gonna be great unless they have dual loading stations or something.
It will have a swicth track section after the station, instead of dual loading like we've seen on some others. The train will move forward once loaded to that switch track (which is a block section) and then slide right to the launch section. The other train can move into the station once the 1st one has moved on to the switch track to unload and load. Once it's loaded, it can then move to the switch track even if the 1st train is still running the course (after that train has cleared the top hat).
PlanOverlay_Draw_FULL-1.jpg (704.15 KiB) Viewed 20073 times
I can't remember who I saved this blueprint overlay from, so I apologize in advance for not crediting properly should they see this.
Ice-Breakers-track-layout-at-SeaWorld-Orlando.jpg (542.47 KiB) Viewed 20073 times