General Carowinds discussion
#103892
The low height of this ride will make track installation a breeze compared to Fury. I remember watching the webcam thinking it would take them all day to install 1 or 2 pieces on the lift and first turn. You had to have multiple large cranes in place, one for the track and another couple to get guys into position to place and bolt it. Very time consuming. Not so here :D
#103902
dirkdiggler1992 wrote:Y’all thinking open for Winterfest?


Track work will probably be done by then, but with all the theming elements on this coaster AND the entire Blue Ridge Junction area, they’ve got a lot left to do by next March.
  • 1
  • 25
  • 26
  • 27
  • 28
  • 29
  • 105